This Blog has been built to track the construction of my Gaff rigged sloop Pathfinder designed by John Welsford. The vessel is 5.25m in length with a beam of 1.95m. Construction started on December 27, 2010. I have named the boat "Chinook". I hope you enjoy following my progress.
Sunday, January 29, 2012
January 2012 progress
My mate Peter and me installing one of the rubbing strakes.
This comment has been removed by a blog administrator.
ReplyDelete